Eco Drill worked endlessly to ensure the New Gas Supply required for heating the Rhino enclosure was ready in time for the arrival of two new baby black Rhinos. The installation was completed and commissioned in time and on budget.
Please click the link for further information in regards to the Rhinos at Flamingo Land.
http://www.flamingoland.co.uk/news/498-flamingo-land-resort-welcomes-new-black-rhinos.html