Eco Drill

New Gas Supply Installation for the arrival of two black rhinos from Zurich on September 23rd at Flamingo Land.

Posted on: September 29th, 2015 by Paul Wilson

Eco Drill worked endlessly to ensure the New Gas Supply required for heating the Rhino enclosure was ready in time for the arrival of two new baby black Rhinos.   The installation was completed and commissioned in time and on budget.

Please click the link for further information in regards to the Rhinos at Flamingo Land.

http://www.flamingoland.co.uk/news/498-flamingo-land-resort-welcomes-new-black-rhinos.html

Copyright © 2024 Eco Drill