Eco Drill

Guided Auger Boring

Eco Drill has the knowledge, competencies and equipment to complete the installation of utilities utilising guided auger boring technology. The Guided Boring method installs pipes with grade and alignment precision.

The pipe installation involves a three-step process – Firstly, a pilot tube is drilled at the precise grade and alignment. Secondly, the pilot tube is used as a guide to install a temporary casing. Thirdly, the temporary casing is removed and replaced by the product pipe.

page_guidedaugerboring

Copyright © 2024 Eco Drill