Butt Fusion Welding

Eco Drill Conduct Butt Fusion Pipe Welding

Operations ranging from 32mm to 600mm. Our competent workforce operates the latest welding equipment to deliver optimum performance in butt fusion welding. An inspection and video survey service is also provided for post and pre installed HDD ducts.

Bead Less Butt Fused Joints

Eco Drill has developed a technique to produce a bead less fusion joint which has been tested and approved to meet recognised industry standards. The weld was developed by Eco Drill whilst working on a Wind Farm project for Dong Energy. This welding technique ensures a smooth internal bore in butt fused cable ducts which eliminates the risk of cable damage upon cable installation.