All Our Latest Projects

JOB ALERT !!

Posted on: March 21st, 2018 by Paul Wilson

Looking for Utility Gangs for Repair & Maintenance Works on Water Projects in North London (Borehamwood).

Must have;

CSCS

CPCS/NPORS

Water Hygiene

SWQR

Long term contact with possible immediate start.

Send CV to info@eco-drill.co.uk

Third Party Certification – Achilles Verify

Posted on: March 7th, 2018 by Paul Wilson

We are proud to announce that we have been successful for the second year in a row to gain 100% for both Management and Site based activities.

100% for Health and Safety

100% for Environmental

100% for Quality

100% Corporate Social Responsibility

Click the Link !!!!

Eco Drill – Achilles Audit Certificate 2018

 

Hornsea – Project One Wind Farm

Posted on: November 22nd, 2017 by Paul Wilson

Eco Drill are very proud to be part of Hornsea Project One Wind Farm, once operational it will become the largest offshore Wind Farm in the world – the first to exceed 1GW in capacity.

Orsted (Formally Dong Energy) are the Asset Owner who appointed J Murphy & Sons as Principal Contractor.

We will deliver 192 separate drills at 64 locations each with a bore containing 3 x 225mm and 1 x 90mm PE HV Electric duct, 3 circuits at each location equating to almost 14km of drilling negotiating Canals, Rivers, Roads, Motorways, HP Gas, Railways HV cables, Water Mains and a Primary Sub Station.

We’ve completed 46 of the 64 drills.

This week we’re drilling a 370m profile across a major roundabout utilising the power of our Ditchwitch JT 100. We’ve chosen a wireline option for steering control. This option was preferred to our Digitrak F5 for two reasons; the obvious is that we don’t want our tracking engineer exposed to any risk with live traffic, the second was that the profile has a challenging radius and we wanted to ensure maximum accuracy through the turn also maintaining the required depth and separation constraints.

The New Year brings two Network Rail crossings and the conclusion of our drilling programme at Hornsea in February.

       

 

WANTED FOR IMMEDIATE START

Posted on: July 28th, 2017 by Paul Wilson

We are looking for experienced drillers and mud engineers for immediate start. These are for long term contracts. If you are interested please call the office or email your CV.

Achillies UVDB – Verify

Posted on: March 9th, 2017 by Paul Wilson

Another third party audit completed with great results. 100% across each of the sectors; Health and Safety, Environmental and Quality. Click the link to download our view our certificate; Achilles Audit Certificate